Lightning protection
We offer the following services
- Turnkey design. Analysis of architecture and soil, development of lightning protection and grounding schemes, selection of materials. We take into account the electromagnetic environment and regulatory requirements.
- Installation of protection systems. Installation of rod, cable and mesh solutions. Installation of vertical electrodes, current conductors and lightning rods. We use only certified materials.
- Control and technical support. Checking connections, surge protection devices, visual and instrumental inspections, resistance diagnostics. Periodic maintenance according to schedule.
- Measurement and reporting. Conducting initial and control measurements. Compiling technical reports, assessing the performance of circuits and nodes.
- Coordination and documentation. Preparation of all project and measurement documentation. Preparation of materials for examination and submission of objects to regulatory authorities.
-
How we work
- We survey the site.
- We develop a project.
- We perform installation.
- We connect protection.
- We take measurements.
Service and support
- Work under a fixed-price contract
- Post-installation support: maintenance, re-measurements, assistance with commissioning
- Transparent reporting and documentation system
How the work is done: from the first call to the protocol
1. Application and initial contact
You submit an application or contact us directly. We clarify:
- the type of facility
- the location
- the current stage of construction or operation
- the need for design, installation or measurement
2. Site survey
Our specialist visits the site (or analyses the technical documentation) to:
- assess the type of soil, access to the grounding point, building structure
- determine the optimal locations for placing elements
- check existing communications and potential risks
3. Design and calculation
We create a project taking into account the parameters according to the standards (PUE, DSTU, EN).
We take into account:
- the depth of installation
- grounding resistance
- the type and number of electrodes, current leads, UZIP
- the potential load on the system
4. Coordination with the customer
Before installation, we approve the project and estimate, explain the key points:
- what materials will be used
- what needs to be prepared on site
- deadlines and control stages
5. Installation and commissioning of the system
The team performs the following work:
- installation of grounding circuits (rods, strips, grids)
- installation of current leads and lightning rods
- connection to building circuits, shields, surge protection devices
- corrosion protection, insulation, fastening inspection
6. Control measurements and tests
Using instruments, we:
- measure grounding resistance
- check the integrity of the circuit
- test the operation of all sections
The results are recorded in the protocol.
7. Transfer of the object and documentation
We transfer:
- the act of work performed
- the technical report and measurement protocol
- operating recommendations and maintenance schedule
8. Post-installation control
By agreement, we perform:
- repeat measurements
- visual inspections
- documentation updates when changing the configuration of the facility or systems